OEM / ODM

Brand it. Tool it. Ship it.

Two paths in T-Star's OEM/ODM programme — print your logo on a stock SKU from 50 pcs, or custom-tool from 1,000 pcs. Same engineering team in either case.

Submit OEM Brief WhatsApp Engineering
OEM (Light)

Stock SKU + your brand, from 50 pcs

Pick any of our 20 stock SKUs, hand us your logo and colourway, and we'll ship branded units in 15–20 days. This is the fastest path to "your" product on shelf — no tooling cost, no engineering NDA.

Standard MOQ from 50 — start with our catalog →

Logo on housing

Laser etch (alloy), silkscreen (ABS), or UV print — your choice. Logo placement reviewed before mass production.

Custom colour

Matte black / silver / midnight / custom Pantone (min 300 pcs for Pantone match).

Retail box

Custom retail box from 500 pcs. Hangtab / FBA-label / multilingual insert all on the menu.

ODM (Full Tooling)

Your own mould, your own coil profile, your own SKU

For buyers who want a product no competitor can copy off Amazon — full ODM programme. Our engineering team tools your housing, tunes the coil to your brand's wattage / case-thickness spec, and certifies the unit under your name.

Tooling cost recovered after 5,000 units

Plastic injection tooling typically US$3,000–8,000 depending on complexity. Amortised across first 5,000 pcs.

13+ years engineering bench

Original engineering team since 2012 — they've shipped 14M+ wireless charger units. NDA available.

Certifications under your name

CE / FCC / RoHS / Qi / Qi2 certifications transferable to your entity — you become the legal manufacturer of record.

Sample → SOP in 6–10 weeks

From signed brief to first golden sample: ~3 weeks. From approved sample to SOP-ready PO: ~3 weeks. Mass production: 15–20 days.

OEM Workflow

What the first 8 weeks look like

  • Week 1 — Discovery You send target spec / market / landed cost. We send back stock-SKU shortlist and a "what's possible at your price" doc.
  • Week 2 — Sample Logo / colour / packaging mock-up. Sample built at MOQ pricing — ships DHL air.
  • Week 3 — Approval & PO Golden sample signed off. PO with 30% T/T deposit triggers mass production scheduling.
  • Weeks 4–6 — Production SMT, assembly, in-line QC, final test. Live updates via WhatsApp on request.
  • Week 7 — QC & packaging AQL 2.5 lot inspection. Retail packaging line. Compliance binder finalised.
  • Week 8 — Shipment 70% T/T balance, BL release. FOB Guangzhou / EXW Shenzhen / CIF on request.

Send your OEM brief — engineering reply in 24 hours

Even a single-page brief is enough to start: target market, spec, MOQ, landed cost. We'll fill the gaps in the first reply.

Submit OEM Brief